100 NEC2002 PDF

General Dwelling Calculation Method (NEC ). By Warren Goodrich. General If 3 or less appliances, then enter at percent. If there are four, or more. Receptáculos y clavijas según NEC Today’s NEC® Page i TABLE OF CONTENTS SECTION DESCRIPTION PAGE Article Defines. NEC Article Definitions, defines Authority Having Jurisdiction as “The organization, office, or individual responsible for approving equipment, materials, .

Author: Vozshura Kinos
Country: Moldova, Republic of
Language: English (Spanish)
Genre: Technology
Published (Last): 6 February 2017
Pages: 17
PDF File Size: 16.40 Mb
ePub File Size: 10.11 Mb
ISBN: 906-7-44094-437-8
Downloads: 55555
Price: Free* [*Free Regsitration Required]
Uploader: Gushura

Enter clothes dryer at va.

You must show that the temporary wiring is under a controlled supervision. Also check with you Utility company and your local Inspector concerning any special local rules applying to temporary services.

General Dwelling Calculation Method (NEC 2002)

All the above was added together to obtain your neutral service conductor demand load calculation of 18, volt amps. If your service panel main over-current device size is 60 amps, you must use a feeder rated no less than a 60 amp rated conductor, from the transformer, through to the main lugs of the service panel, or the lug of your main over-current device depending on the service rated panel style that you plan to use.

This will be your starting point from here. The NEC states that you must install a strap near each end of the conduit. In this case your calculated demand load dictating your main service rated panel required a minimum main service rated panel size of amps.

Find Local Contractor Call: If the any box is metal, you must bond the metal box to the grounding conductor. If all volt receptacles installed on the temporary or installed for use as temporary wiring are on the same branch circuit, the GFCI protective device installed as the first receptacle on that circuit may protect be used as the GFCI protective device serving all other receptacles on that circuit attached to the load side of that GFCI protective.

You must ensure that whichever panel you use to install as a panel used on a temporary service pole is a service rated panel. Keep in mind that the chart in NEC Article Enter Your Zip Code: NEC Appendix C 9. Apply household cooking equipment total number of all cooking equipment to demand factor, in va. The following requirements will not be found in the NEC, but these requirements will most likely be required by either the Utility Company rules, or the Authority Having Jurisdiction.

  13007 TRANSISTOR PDF

We must size our grounding electrode conductor by NEC Table The total of all of the above calculations, with the exceptions of the first 3 steps, will give you the total va. A and NEC Article To view an example of the inside wiring of a main service rated panel or disconnect you may view by clicking on the picture icon to the left.

This is where you really should make those two contacts both the AHJ [local Electrical Inspector] and your serving Utility Company for specialized local rules.

In NEC Table Add in 3, va. All boxes on an overhead temporary service pole will be considered exposed to wet location. The main service nec002 or main service disconnect fuse size is required to be sized equal to or exceeding that amp rating listed. One example of an overhead temporary service may be viewed by clicking on the picture icon to the left.

General Dwelling Calculation Method (NEC ) – Self Help and More

Please keep in mind, that if you use a single main overcurrent device smaller than the maximum rating of your service panel, you may reduce the feeder size to equal your main overcurrent device maximum rating, but you must provide ampacity of that service conductor equal to the maximum demand load to the equipment to be used. Some panels are not approved as a service rated panel but only allowed to be used as a non service rated panel [sub panel].

This is necc2002 regardless of the temperature rating of the insulation of that conductor. PVC is not exempt from the plastic bushing requirement for conductors 4 awg or larger.

A You will find in the Chapter for temporary wiring that any electrical service is not considered as temporary but must be referred to NEC Nc2002 for permanent service installations.

Please keep in mind that any conductor 4 awg or larger must be protected with plastic bushings on the ends of the conduits. D 10 awg or smaller conductors. D The maximum size wire to your receptacles, through your 100 nipple, from your overcurrent device [breaker or fuse], is 12 awg using a 20 amp maximum size overcurrent device. Apply nec202 lighting demand factor to the total of the above 3 steps. This will now be your adjusted demand load, concerning all of the fastened-in-place appliances va.

Find the largest motor involved, and multiply that motor’s full load current flc by 1100 percent, and enter that figure.

A temporary overhead pole service is only a normal electrical service mounted on a pole. Search for great deals on electrical from local home improvement companies and contractors. D and NEC If there are four, or more appliances, on list of fastened-in-place appliances, enter at 75 percent of the total sum of appliances va.

  1042S INSTRUCTIONS 2014 PDF

If your service panel main over-current device size is 30 amps, you may use a feeder rated no less than a 30 amp rated conductor, from the transformer, through to the main lugs of the service panel, or the lug of your main over-current device depending on the service rated panel style that you plan to use.

If installing a grounding electrode conductor to a made electrode the maximum grounding electrode conductor 010 required is a 6 awg copper conductor NEC Article If you are using aluminum wiring you must use anti-oxidation inhibitor [Nolox] at each connection of that aluminum conductor. An example of a two circuit service rated panel may be viewed by clicking on the picture icon to the left.

When wiring a service rated panel the neutral bar and the grounding bar must be married together as well as containing a main bonding jumper to the metal of the main service rated panel or disconnect 1000.

Checking with the NEC Table In comparing for the best deal between the two NEC tables Add in 1, va. Before we size our minimum neutral service conductor size we must compare that neutral service conductor size found in NEC Table You really should call your local Inspector and your local Utility company to confirm what rules apply in your area concerning that meter base.

Suggested Wiring Procedures for an Overhead Temporary Service Pole (NEC ) – Self Help and More

D Please leave approximately 3′ sticking out beyond the weatherhead allowing enough conductor length that the Power Company may have enough to work with during their connection to your service entrance conductors.

The Authority Having Jurisdiction will use the NEC articles referring to the requirement that any permanent wiring style must be substantially mounted to a permanently installed structure. If you use a type service panel with only two circuits in the box, you must use a minimum rating of 30 amps, weatherproof service rated panel.

Now refer to nec chart Check the support requirements of the style and type of conduits you are using.