ASME RTP-1-2000 PDF

Addenda to RTP Reinforced Thermoset Plastic Corrosion Resistant Equipment. View Abstract. Product Details. Detail Summary. View all details. LARRY CRAIGIE, American Composites Manufacturers Association. Delaware adopted as code the ASME International. Standard RTP (Parte 1 de 9). Reinforced Thermoset. Plastic Corrosion Resistant Equipment. ASME RTP-1– (Revision of ASME RTP-1–). Reinforced Thermoset.

Author: Faesar Grokinos
Country: Cyprus
Language: English (Spanish)
Genre: Life
Published (Last): 26 September 2006
Pages: 429
PDF File Size: 11.64 Mb
ePub File Size: 19.26 Mb
ISBN: 883-3-22128-484-2
Downloads: 27478
Price: Free* [*Free Regsitration Required]
Uploader: Fenrill

The biggest task for the user is to become familiar enough to realize that a pipe fabricator may not build a vessel as economically as one who is in the business of making vessels.

In recent months, many fabricators, and end users have come to realize that this document which was intended to provide top quality equipment is being used as a reference for design or laminate quality, without regard to the other sections which cover workmanship, inspection, material verification and testing. In formulating the rules, the Committee considers the needs of users, material manufacturers, fabricators, and inspectors of this equipment.

Galasso, Norwest Design Associates G. At the same time, a vessel fabricator may not build pipe as economically as a pipe fabricator. Buckling of symmetric laminated fiberglass reinforced plastic This thesis was presented by Calvin D. Choosing the wrong fabricator can be as detrimental as making the wrong choice on material, less than desired quality, or design.

Yin, Fluor Daniel Inc. Organizations that are authorized to use Symbol Stamps for making items or constructions that have been constructed and inspected in compliance with ASME codes and standards are issued Certificates. Proceedings of an international conference Oceanology: It is important to note that fabricators have different capabilities. Covey, Plas-Tanks Industries, Inc. Davis, Alternate, Ershigs, Inc. Revisions become mandatory as requirements 6 months after such date of issuance.

These include requirements for materials, design, fabrication, examination, inspection, and stamping. However, the misconception that by specifying “to be built in accordance with” will automatically yield a better product has caused some users to be disappointed after they take delivery of their equipment.

  BD CHAURASIA LOWER LIMB PDF

Parte 1 de 9. The ASME Symbol Stamp shall be used only for stamping and nameplates as specifically provided in the code or standard. Rock Mechanics Symposium and 5th U. The Committee meets regularly to consider requests for interpretations and revisions of the rules, and to develop new rules as dictated by technological development.

Built in Accordance with ASME RTP-1, What Does This Really Mean? – OnePetro

This paper will attempt to clarify some of the major differences in “built in accordance with” vs. The Standards Committee that approved the code or standard was balanced to assure that individuals from competent and concerned interests have had an opportunity to participate. Sometimes the catalyst system and the veil material will produce a completely different product. Based on these objectives, the following policy has been established on the usage in advertising of facsimiles of the symbols, certificates, and references to codes or standards construction.

ASME accepts responsibility for only those interpretations of this document issued in accordance with the established As,e procedures and policies, which precludes the issuance of interpretations by individuals. Davis, Chair, Ershigs, Inc.

ASME issues written replies to inquiries concerning interpretations of technical aspects of this Standard. Craigie, Alternate, Consultant R. They may be used beginning with the date of issuance shown on the Addenda.

Asme rtp-1-2005

No part of this document may be reproduced in any form, in an electronic retrieval system or otherwise, without the prior written permission of the publisher, except as otherwise noted on forms contained in this document.

Colley, Ashland Composite Polymers T. Publishers Content Coverage Privacy. Cowley, DuPont Engineering Co. Van Name, Rtp–2000 O.

Items constructed in accordance with all of the applicable rules of ASME are identified with the official Symbol Stamp described in the governing code or standard. Such usage may be by an association or a society, or by a holder of a Symbol Stamp who may also use the facsimile in advertising to show that clearly specified items will carry the symbol. This Standard does not address all aspects of these activities and those aspects that are not specifically addressed should not be considered prohibited.

  DAMNARE LAUREN KATE PDF

Resin manufacturers, fabricators and consultants can provide a variety of choices to solve corrosion problems.

Participation by federal agency representative s or person s affiliated with industry is not to be interpreted asm government or industry endorsement of this code or standard. Proceedings of an international conference Subsea Controls and Data Acquisition ‘ About us Contact us Help Terms of use. The proposed code or standard was made available for public review and comment that provides an opportunity for additional public input from industry, academia, regulatory agencies, and the public-at-large.

Keeler, Dow Chemical Co. Berg, Alternate, Occidental Chemical Co. Users of a code or standard are expressly advised that determination of the validity of any such patent rights, and the risk of infringement of such rights, is entirely their own responsibility.

National Standards Institute and published in Mechanical Engineering to invite comments from all interested persons. Shelley, DuPont Engineering Co. There will be no addenda issued to this edition. However, facsimiles may be used for the purpose of fostering the use of such construction.

Log in to your subscription

Krmpotich, Belding Tank Technologies A. This Standard is not a design handbook and cannot replace education, experience, and the use of engineering judgment. This thesis was presented by Calvin D. Asma ocupacional asma ocupacional. ASME does not take any position with respect to the validity of any patent rights asserted in connection with any items mentioned in this document, and does not undertake to insure anyone utilizing a standard against liability for infringement of any applicable letters patent, nor assumes any such liability.

Proceedings of an international conference Diverless and Deepwater Techology: Inspection of the equipment is also a vital part of the process and must be performed by personnel that have experience in design, fabrication and quality of the materials.