1. Application Description 1) Service Description The base station commissioning indicates that the users commission and verify the base. OptiX RTN Radio Transmission System. VRC Commissioning and Configuration Guide (Web LCT). Issue, Date, HUAWEI. Huawei DBS Commissioning Procedure Security Level: Huawei DBS Commissioning Procedure (V) HUAWEI Confidential Page1.

Author: Arashigar Kagagami
Country: Denmark
Language: English (Spanish)
Genre: Automotive
Published (Last): 7 November 2014
Pages: 104
PDF File Size: 7.85 Mb
ePub File Size: 14.73 Mb
ISBN: 736-4-66919-585-6
Downloads: 47419
Price: Free* [*Free Regsitration Required]
Uploader: Murisar

The huwei procedures for different base stations all include the following aspects: If required the engineer may have to remain off site until tower crews have finished any ongoing operations. This report then provides the basis comimssioning scheduling activities for commissioning preparation and commissioning activities. The details of this process are not covered in this document and is only included for informational purposes. To do this the engineer will need to us a compass to find orientate the direction of the sectors and then verify the Cell ID and scrambling codes for each antenna.

The engineer will need to resolve or account for any active alarms on the NodeB with the assistance of the RNC engineers and Huawei technical support. Call P Testing If the RNC engineer is not able to provide the necessary support the local huzwei will need to contact Huawei technical support. Check the download speed 4. Connect laptop and NodeB with a Fast Ethernet cable. Click Add and Fill the table.

The hardware has been installed. Make a call and walk around the site, to make sure there is no call drop. Site Access Procedures On attending site the engineer will be required to follow the site access procedures laid out below. Then double-click Software Update, as before.

A valid Huawei ID card will be required for all engineers attending site. For different base station commissioning scenarios, the following methods can be used: Then double-click Software Update. Remember me on this computer. The RNC engineer will need to unlock the cells and load the appropriate license keys for the NodeB configuration.

  ISO 13408-2 PDF

Sub-contractor team got the correct NodeB software and Script from Huawei. Call RNC Engineer to block all cells. The following section will provide a breakdown of the activities required for successful commissioning of the base station.

Make sure the PSC is right in each cell. Click the […] button on the Office row. This file will become part of the site documentation package. If the some of the commands failed, please call RNC Engineer for troubleshooting. The document will provide the required tools, contacts and procedures to be followed. Please wait minutes. Commissioning Preparation In order for commissioning preparation to be considered complete the following must have happened.

This procedure must happen all the time, every time. And then you can get the values in this XLS file. Make a PS download and walk around the site, to make sure there is no call drop. Fixed Network Info Community Members: The DBS will carry out a reset after the software and the data configuration has been activated.

RTN VRC01 Commissioning and Configuration Guide 02(Web LCT) – Huawei

Once the NodeB has reset the new configuration will take effect. Click here to sign up. The following dialog box will then be displayed. From this report a forecasting schedule will then be produced to initiate the site configuration data to be prepared and the scheduling of engineers to attend site for commissioning. If it is not the right version, please do Item 10 Local Commissioning again.

The following methods can be used for quick commissioning: Sub-contractor team got the special USB memory stick with LED available and kept the NodeB software and script with the correct name, file format commissioning the correct path as following: Log In Sign Up. Application Description 1 Service Description Btd base station commissioning indicates that the users commission and verify the base station based on design requirements to ensure that the base station can work properly.

  IGCSE CAMBRIDGE INTERNATIONAL MATHEMATICS 0607 EXTENDED PDF

Scope The scope of this document is to give a detail procedure for the commissioning of the Huawei DBS base station. After you finish the huwei test, please call RNC Engineer to unblock cells and block cells, you can make calls and Handover After you finish the callp, please call RNC Engineer to unblock all cells and tell them the Callp on site finished. Wireless Network Info Community Members: Site Installation Checks Before the huaei begins the commissioning of the base station they will be required to carry out an audit of the installation quality.

Save it and send all these three files to Huawei. If you are a beginner or only need to commission the base station in a specific scenario, see the corresponding micro base station huawe commissioning guide. Testing will differ slightly between S and S sites due to the different in cells present on the site.

Commisioning to main content.

RTN 950 V100R003C01 Commissioning and Configuration Guide 02(Web LCT)

You need set IP Address is Core Network Info Community Members: Return New post Share. Enter the email address you signed up with and we’ll email you a reset link.

The diagram below details the orientation of the Antennas, the first sector Alpha is the one orientating to the north east, alone the clockwise, are the second Beta and the third Gamma sector.